Ji Exteriors Suffolk County
Patchogue, Suffolk County
Not confirmed in the Nassau register on October 28, 2026. Ask to see a current license.
Patchogue snapshot, can change, not guaranteed.
Get a quoteA house on the Patchogue River and a house on Roe Boulevard can share a mailing town and still answer to different permit offices.


This page lists roofing companies with a Patchogue address in Suffolk County. The Village of Patchogue is an incorporated village inside the Town of Brookhaven with its own building department at 14 Baker Street, so a house inside the village goes there, not to Farmingville. Village code bars plywood, OSB or plastic as a finished roof except in an emergency, and then for no more than 90 days.
Last reviewed October 31, 2026.
The roofer’s estimate says Patchogue. So does your mail. Neither one tells you which office signs off on the job.
The Village of Patchogue draws its own line: Blue Point on the west, Roe Boulevard on the north, Bay Avenue on the east, the Great South Bay on the south. Inside it, the village runs its own building department, its own planning and zoning boards and an architectural review board. Step outside it and the house belongs to the Town of Brookhaven.
The village Building Department sits at 14 Baker Street. It says it manages and approves all construction and alteration of homes and commercial buildings inside village boundaries, under the state building and fire codes and the village zoning code.
What we did not find is a village page that answers the reroof question head on. So call 631-475-4300 before the crew orders material. If the house is outside the line, the Brookhaven roofing permit guide covers the town code, and this page leaves it there.
The same department page carries a warning worth reading twice. It never asks for payment through an email link or a wire transfer, and scammers have sent permit applicants fake invoices. If a bill lands in your inbox, call the department at its published number before you pay anything.
Section 238-43 of the village code says roofing on any dwelling has to be a material the New York State Uniform Fire Prevention and Building Code approves. Plywood, OSB or plastic cannot serve as a permanent finished roof except in an emergency, and then for 90 days at most.
So after a storm, the blue tarp is on a clock. Start counting the day it goes up.
That section also requires a container permit from the Village Clerk before anyone drops a construction container in the village. The Board of Trustees sets the fee by resolution, so ask the clerk whether the roll-off for your tear-off needs that permit and what it costs right now.
Noise gets a section of its own. Section 281-10 covers construction noise crossing a residential property line from 8 p.m. to 7 a.m. on weekdays, and at any hour on Sundays and legal holidays. A crew that starts at 7 a.m. on a weekday lands outside those hours. Work at other times still answers to the general sound limits in Section 281-3.
New York State’s NY Forward write-up says Patchogue was founded in 1812 along the Great South Bay and was once called Mill Town, for its shipbuilding and industry. The village adopted a flood damage prevention chapter in 1998 and rewrote it in full on January 28, 2013. Even the village FAQ on sheds lists floodplain rules among the zoning limits a small structure has to meet.
If the house is near the river or the bay, ask the Building Department whether it sits in a mapped flood zone and whether that changes anything on a roof job.
Our code search turned up no village historic district. The village window FAQ does say a historic property can need more approvals, so mention it if your house has a landmark listing.
The National Weather Service storm page for the February 22 to 23, 2026 blizzard lists 30.0 inches in North Patchogue from a public report, and 20.0 inches one mile east-southeast of East Patchogue from an NWS employee. Blue Point, the village’s western neighbor, reported a 60 mph gust. The same page logs a tree down across Erving Avenue in East Patchogue.
After a storm like that, walk the yard and look up. Check the shingles along the rakes and the ridge. Check whether the gutters still sit tight to the fascia. Ice along the eaves has its own ice dam guide, and gutter work lives on the gutter page.
In the October 2026 snapshot, three companies on this site give a Patchogue address. Two are on Medford Avenue, which is also Route 112, and one is on West First Street. All three cards mark roofing, and one marks siding.
A local address does not mean a shop knows the village counter better than a Medford or Shirley company does. Ask each one who pulls the permit and who books the container. The license line on each card is explained in the Suffolk license guide, and the check behind it on how we check contractors.
Patchogue, Suffolk County
Not confirmed in the Nassau register on October 28, 2026. Ask to see a current license.
Patchogue snapshot, can change, not guaranteed.
Get a quotePatchogue, Suffolk County
Not confirmed in the Nassau register on October 28, 2026. Ask to see a current license.
Patchogue snapshot, can change, not guaranteed.
Get a quotePatchogue, Suffolk County
Not confirmed in the Nassau register on October 28, 2026. Ask to see a current license.
Patchogue snapshot, can change, not guaranteed.
Get a quoteStraight answers, with the source linked below.

We could not find a published Patchogue answer for a roof covering alone. The village FAQ warns that exemptions vary and are open to interpretation, and tells owners to check before work starts rather than assume. Work started without a needed permit can bring a stop-work order, fines and after-the-fact approvals that the FAQ says can be more costly and complicated than getting the permit upfront. Call the Building Department at 631-475-4300 and write the answer into the contract.
Section 238-43 of the village code says plywood, OSB or plastic may not be used as a permanent finished roof except in an emergency, and then only for up to 90 days. Count from the day the tarp or boards went on, and book the repair well inside that window. Water already coming in is emergency roof repair.
Section 281-10 of the village noise code covers construction noise that crosses a residential property line between 8 p.m. and 7 a.m. on weekdays, and at any time on Sundays and legal holidays. The section names Sundays and holidays and does not single out Saturday in the text we read. If a Saturday start matters to you, ask the Building Department. Houses outside the village follow the Brookhaven town noise rules instead.
The village code says no one may place a construction container in the village without a container permit from the Village Clerk, with the fee set by the Board of Trustees. Before you sign, ask the roofer whether its price includes that permit.
No. The village Building Department posts a warning that it will never ask for payment through email links or by wire transfer, and says scammers have sent applicants fake invoices. Call the department on its published number before paying anything that arrives by email.
All three cards in the October 2026 snapshot give a Patchogue address, two on Medford Avenue (Route 112) and one on West First Street. We have not checked each address against the village line. Roofing is marked on all three and siding on one. Where your own house sits matters more than where the shop is.
Hi, I'm Scout.
I've read every guide on this site. Ask me anything about your house.
Scout Your guide
Ready when you are
Scout's answers are written ahead of time from this site's sourced notes. Scout is not a roofer, so check the county license before you hire.