Last reviewed October 31, 2026.
A roofer finishes measuring a shingled house on one of the steep streets above the harbor. Before writing up the price, the roofer asks the question that matters here: who pulls the permit, the village or Brookhaven? Inside the village line, it’s the village. And its paperwork reads differently from the town’s.
What Port Jefferson Village puts in writing about a new roof
The village’s Building and Planning page has an FAQ on when a permit is needed. It answers “It’s the law!” and says “A Building Permit is required for New Homes, Additions, Alterations, Manufactured Homes, and certain Accessory Structures.” Roofing never comes up. The same page tells owners: “Prior to beginning any work on your property please contact the building Department to determine whether your scope of work requires a permit.”
The application form doesn’t settle it either. Its project checkboxes cover alteration and repair of a single family dwelling, fire repair, chimney repair and an “Other” line. There is no box for a roof. We found no village document that calls a reroof on a house exempt, and none that says it always needs a permit.
So pick up the phone. Call 631-473-4744 with the scope (tear-off or overlay, and whether sheathing or rafters are being replaced), then write down who answered and the date.
Either way, the roof has to meet state rules. Chapter 101 of the village code adopts the New York State Uniform Fire Prevention and Building Code and the Energy Conservation Construction Code, and that holds whether or not a permit is issued.
Filing with the Building and Planning Department
The department’s web page lists what a filing needs: the completed application, a survey showing the work, signed and sealed construction drawings, ownership proof such as a tax bill, the existing certificate of occupancy or certificate of existing use, and proof of insurance and license for all contractors.
One snag. The page asks for 2 copies of the application, survey and drawings, while the instruction sheet on the village’s application PDF asks for 4 sets. Ask the counter which count it wants now.
The application also asks you to sign your name to a few things: a sworn affidavit, a disclosure certification and an owner consent that lets village staff enter and inspect the site. Each one warns that false statements are a Class A misdemeanor under the state Penal Law. A short environmental form asks whether the property sits on or next to a beach, harbor, pond, stream or wetland, and whether a structure’s appearance “differs markedly” from the neighborhood.
The website puts the office at 121 W. Broadway, Port Jefferson, NY 11777, open Monday to Friday, 9 a.m. to 4:30 p.m., and suggests getting there before 3:30 p.m. The application pages still print 88 North Country Road, so confirm the drop-off address before you drive over. We found no online permit portal on the village site.
Suffolk license and insurance proof for the roofer
The village application says all plumbers, electricians and contractors must be licensed by Suffolk County, and the proof goes in before the permit is issued. Each of them also needs workers’ compensation and liability insurance. Suffolk County Consumer Affairs lists roofing among the trades its home improvement license covers and verifies licenses at 631-853-4600. Our Suffolk license guide walks through the lookup.
The half percent fee, the bond and the late charges
Port Jefferson prices a permit off the job, not off square footage:
| Charge | What the village publishes |
|---|---|
| Building permit fee | 0.5 percent of construction cost, $200 minimum |
| Bond | $1,000 when construction cost exceeds $20,000 |
| No permit before construction | $500 late filing fee |
| No certificate of occupancy within 12 months | $500 late filing fee |
Skip the permit and the website puts the penalty at $500, adding that building without one “will only cause more hardship and delays in the future.” The application goes further. When owners seek a certificate for finished work that skipped inspections, the village may require that work be removed so it can be inspected. On a roof, that can mean opening up decking that is already shingled over.
Expiration dates and the certificate of occupancy deadline
The village does not publish a single validity period. Its web page says “The date of expiration is printed on your Building Permit,” and the office section of the application leaves blanks for an expiration date and a renewal date.
The one firm number in writing is 12 months. That is how long you have to obtain a certificate of occupancy on permitted work before the $500 late fee applies. After the final inspection, the department mails a list of what it needs to issue that certificate.
Architectural review near Main Street and the harbor
The Board of Trustees created an Architectural Review Committee in 2000, according to the committee’s design guidelines dated December 2001. Those guidelines cover new construction and alterations in the C-1, C-2, M-W, R-O, I-2 and P-O zoning districts, the area around Main Street from the train station to the harbor. The Building Inspector or Planning Board may refer an applicant to the committee, and the guidelines say historic replication “is not, however, insisted upon.”
The 2001 materials chart gets specific about roofs. It encourages natural slate, standing seam metal with a small seam width in an approved color, and asphalt shingles in black or gray, single tone. It lists imitation slate and fiberglass as not recommended.
The committee is still at work. The Planning Board’s January 8, 2026 minutes show the board reviewing committee comments and sending Main Street and waterfront applications its way. If the house sits in one of those districts, ask the Building Department whether a material or color change will go to the committee. We did not find a separate historic district or landmark law in the village code.
Port Jefferson Station is not the village
Suffolk County lists Port Jefferson among the villages in the Town of Brookhaven, alongside neighbors such as Belle Terre, Poquott and Old Field. Port Jefferson Station and Terryville are not on the county’s village list, so homes there go to Brookhaven. Its rules are in our Brookhaven permit guide.

