Mineola Roofing Permit

Mineola is a village with its own building department and its own fee table. Its written pages never mention reroofing by name, so here the phone call to that department matters more than in most places.

Get free quotes

Two roofers in harnesses lifting old shingles
Roofer in a hard hat carrying lumber across an open roof frame

Last reviewed October 31, 2026.

The roofer’s estimate is on the kitchen table, a few blocks from the county courthouse, and one question is left: who issues the permit? In Mineola, neither town does. The village, incorporated in 1906 according to its own history page, keeps its own Building Department at 155 Washington Avenue. A roof job inside the village starts there.

Mineola’s paperwork never says reroof

Search the village’s posted material for the word reroof and you come up empty. The Building Department page asks residents planning “any construction or renovation in or outside of the home” to contact the department for the permits and code inspections they need. It names decks, fences and pools. Roofs don’t make the list.

The nearest thing to a roofing rule hides in the permit packet. Its Building and Construction Inspection Acknowledgement, which the owner or applicant signs in front of a notary, says permitted work gets inspected before any part of it is enclosed or covered. It lists “exterior roof” right beside framing, wall sheathing and the trades. So the village inspects roofs that are under permit. Which roof jobs need one, it never says.

The permit application spells out its main rule in capitals: “NO WORK SHALL COMMENCE BEFORE A BUILDING PERMIT HAS BEEN ISSUED.” Before you sign a contract, call the Building Department at 516-746-0750 and describe the job: tear-off or overlay, any new plywood, any change to the roof framing or shape. Write down the name of the person who answers and the date.

What a Mineola permit costs

The fee schedule, marked revised August 4, 2026, starts a building permit at $100 for the first $1,000 of work and adds $20 for each additional $1,000. Run a $15,000 contract through that formula and you land at $380. The sheet doesn’t say how a partial thousand is counted, though, so confirm the number at the counter.

Item on the Mineola scheduleFee
Building permit$100 for the first $1,000, plus $20 per additional $1,000
Legalize and maintain existing workTriple the fee
Certificate of completion$50
Dumpster, roll-off or storage container$150 per month
Scaffolding$500 per month
Architectural Review Board, residential$250

A tear-off with a roll-off at the curb needs one more form: the separate Dumpster Permit Application posted on the village forms page.

Putting together a Mineola permit package

Mineola wants everything at once. The application form, revised October 1, 2024, turns away copies and faxes and says every application must arrive as a complete package. The checklist asks for:

  • the completed application
  • the Nassau County assessor’s form
  • a legible property survey
  • three sets of construction plans, signed, sealed and stapled
  • notarized signatures

The packet’s checklist page goes further. Plans must come from a registered architect or professional engineer and meet the current New York energy conservation code, and incomplete applications are returned.

Nothing in that checklist carves out a simple reroof, so ask on the call whether a like-for-like job needs sealed plans. Once the permit is issued, the application says the red permit card has to be displayed prominently at all times.

The department sits at 155 Washington Avenue, Mineola, NY 11501, open Monday to Friday from 8:30 a.m. to 4:30 p.m.

The certificates Mineola wants on file

Contractors file three certificates: workers’ compensation, New York disability (on form DB-120 only) and general liability coverage of no less than $2,000,000. The village has to be the certificate holder on every policy and an additional insured on the liability policy. An owner doing the work alone signs a notarized affidavit in the packet and hands in a homeowner’s insurance certificate instead.

The village does not license roofers. Nassau County’s home improvement FAQ says contractors who remodel residential homes in the county must be licensed, and our Nassau license guide shows how to check one before you sign.

Legalizing roof work after the fact

The first inspection on any permit doubles as a look around. Mineola’s application warns that the building inspector will check for structures that were never legalized. The owner then has one month to fix it, after which “failure to legalize will result in summons, stoppage of construction, and/or court action.” The fee schedule prices legalizing and maintaining existing work at triple the normal fee.

One gap in the paperwork: we found no published figure for how long a Mineola permit stays valid. The county assessor’s form in the packet has boxes for a date work must begin and a permit expiration date, but the village does not post the length. Ask when you file.

Historic sites, truss framing and design review in Mineola

Chapter 294 of the village code covers designated historic sites. Once a property is designated, no one may make an exterior alteration or a material change in its appearance without a certificate of appropriateness from the Board of Trustees, and the Building Department may not issue a permit until that certificate exists. Ordinary maintenance and repair that keeps the same design, material, color and outward appearance is excluded. So on a designated house, a switch from slate to asphalt, or a new color, goes in front of the board first.

Rehabilitation work on an existing house brings in another form, the Notice of Truss Type Construction. An architect or engineer signs and seals it to report truss, pre-engineered wood or timber construction in the floor or roof framing, and the form names the Mineola Fire Department at 171 Jericho Turnpike.

The Building Department page says it works with the Zoning Board, the Planning Board and the Architectural Review Board. Chapter 198 sends architectural review to the Planning Board. For a one- or two-family house in a residential district, though, it exempts alterations that keep the front building lines and rooflines and add no more than 40% to the floor area. The same chapter exempts exterior alterations that do not change building coverage or floor area from site plan approval. Neither section mentions roofing material or color, so raise that on the call too.

Hempstead or North Hempstead makes no difference here

Nassau County counts 64 incorporated villages across its three towns, and its directory files Mineola under the Town of Hempstead. The Town of North Hempstead lists Mineola among its 30 villages, at the same 155 Washington Avenue address. We found no official source that settles how much of the village sits in each town. For a roof permit, the split does not matter. Chapter 25 of the village code sets up a village Department of Building and Code Enforcement, headed by the Superintendent of the Building Department.

Cross the village line and a town takes over. The North Hempstead guide and the Hempstead guide cover those rules.

Questions about Mineola roofing permits

Straight answers, with the source linked below.

Do I need a building permit to replace my roof in the Village of Mineola?

The village does not say in writing either way. Its Building Department page asks residents planning any construction or renovation in or outside of the home to contact the department for permits and code inspections, and its inspection form lists the exterior roof as a stage that gets inspected. Call the Building Department at 516-746-0750 before the crew starts.

How much is a Mineola building permit?

The village fee schedule revised August 4, 2026 charges $100 for the first $1,000 of work and $20 for each additional $1,000. A certificate of completion is $50, and a dumpster or roll-off permit is $150 a month.

What happens if roof work was done without a permit in Mineola?

The same fee schedule lists legalizing and maintaining work at triple the fee. The permit application warns that violations found on the first inspection must be legalized within one month, or the owner faces a summons, a stop on construction or court action.

Is Mineola in the Town of Hempstead or North Hempstead?

Official lists place it in both. Nassau County files Mineola under the Town of Hempstead, while the Town of North Hempstead lists it among its 30 incorporated villages. For a permit it makes no difference, because the village Building Department at 155 Washington Avenue handles work inside the village.

Does my roofer need a license to work in Mineola?

Nassau County says contractors who remodel residential homes in the county must be licensed. The village adds its own insurance rules for contractors, including at least $2,000,000 in general liability coverage with the village named as additional insured.

Sources (13) checked October 2026
  1. Village of Mineola, Building Department
  2. Village of Mineola, Building Department Fee Schedule (revised August 4, 2026)
  3. Village of Mineola, Building Department Forms and Documents
  4. Village of Mineola, Building Permit Application (revised October 1, 2024)
  5. Village of Mineola, Complete Building Permit Application Packet
  6. Village of Mineola, Notice of Truss Type Construction
  7. Village of Mineola, About
  8. Village of Mineola Code, Chapter 294, Historic Preservation
  9. Village of Mineola Code, Chapter 198, Architectural and Site Plan Review
  10. Village of Mineola Code, Chapter 25, Code Enforcement
  11. Nassau County, Cities, Towns and Villages
  12. Town of North Hempstead, Incorporated Villages
  13. Nassau County, Home Improvement license FAQ
Get free quotes